Performing Motor Winding Maintenance

Perform impulse testing and use the results in motor winding maintenance and trend management.

Measurement Example

Check for Insulation Defects and Deterioration
Even If No Non-Defective Part is Available

On a standard, properly configured 3-phase motor, the phases (U,V,and W) are balanced. Consequently, the response waveforms obtained when an impulse voltage is applied between phases (U-V,V-W,W-U) will be almost identical.

By tentatively identifying the response waveform obtained from one phase as the waveform for a non-defective part and comparing it to the response waveforms from the other phases, you can detect insulation failures and deterioration.

Non-Defective Product Response Waveform
Example of Response Waveform Exhibiting Insulation Deterioration
Example of Response Waveform Exhibiting Insulation Short

Equipment Used

IMPULSE WINDING TESTER ST4030A

IMPULSE WINDING TESTERST4030A

・High-precision waveform detection: 200 MHz, 12-bit resolution

・Quantification of response waveforms
(using a patent held by Toenec Corporation)

Products Page Brochure
Discharge Detection Function ST9000

Discharge Detection FunctionST9000

・Detection of discharges obscured by noise
(option)

Products Page

Download the catalog summarizing the applications of this site or get in contact with HIOKI in your country.

Catalog PDF download & contact info